IZ Slavej

The Industrial zone Slavej is located in the settlement named Slavej – Municipality of Krivogashtani, on the road Prilep – Krushevo. The zone is located 6,5 km from Krivogashtani and 15 km from Prilep. The industrial zone has electricity, water, drainage and purgation station, telecommunication. The total area of the zone is 6.622 ha, with a degree of development of 10%. The zone is 100 % private ownership and all the free building lots are currently sold.

 

ИЗ Славеј

 

 

Total area:                               66.220 m2 (6,622 ha)
Degree of development:     10%
Ownership:                             100% private ownership

Contact:                                    Sasho Cuculovski – Municipality of Krivogashtani
Telephone:                                070/634-957
Email:                                          [email protected]
Web site:                                    www.krivogastani.com

Infrastructure:                       Partial line infrastructure

Companies that work in the zone:
– Krivogashtani Promet – company for vegetable processing
– Stefan Ltd. – trade company for grades and seeds, protection materials and repurchase of agriculture products. The company’s facility is currently being built.

Lease/sale:                              100% sold

 

Distances

Distance from: Kilometers
Regional road A3 22
Highway  E – 75 73
Train station Prilep 10
Airport Skopje 190
Airport Ohrid 110
Airport Thessaloniki (R. Greece) 240
Prilep 10
Bitola 60
Krushevo 25

 

Кривогаштани 1

 

Characteristics of the free building lots

Number of building lot Area (m2) Construction area (m2) Maximum construction height (meters) Initial price for the land

(den/m2)

Fee for arranging construction land – price (den/m2) Purpose
1 15.148,83 13.063,42 P + 1 70,00 1.050 x 0.05 G2, G3, G4
2 25 / P + 1 70,00 1.050 x 0.05 Е2
3 10.687,69 8.748,11 P + 1 70,00 1.050 x 0.05 G2, G3, G4
4 11.152,58 8.835,23 P + 1 70,00 1.050 x 0.05 G2, G3, G4
5 31.5965 2.106,60 P + 1 70,00 1.050 x 0.05 G2, G3, G4
6 3.645,50 1.967,50 P + 1 70,00 1.050 x 0.05 G2, G3, G4
7 25 / P + 1 70,00 1.050 x 0.05 Е2
8 1.530,06 459 P + 1 70,00 1.050 x 0.05 G2, G3, G4
9 1.498,93 459 P + 1 70,00 1.050 x 0.05 G2, G3, G4
10 1.501,79 440 P + 1 70,00 1.050 x 0.05 G2, G3, G4
11 1.497,48 440 P + 1 70,00 1.050 x 0.05 G2, G3, G4
12 1.456,15 365,5 P + 1 70,00 1.050 x 0.05 G2, G3, G4
13 1.590,18 365,50 P + 1 70,00 1.050 x 0.05 G2, G3, G4

New industrial zones

-Expanding of existing industrial zone Slavej

-Construction of new industrial zone Borotino (20 hectares)

-Construction of new industrial zone Slavej (Slavej -Zapolzani) 5 hectares.

-planned activities 2017-2020