IZ Prilep 2
The Industrial zone Prilep 2 is located in the southwestern part of the city, in the area of the former livestock market, near the regional road to Bitola R1101 (old road). In the zone complete infrastructure is present, including water supply system, sewerage and electricity.
Total area: 36.000 m2 (3,6 ha)
Total number of lots: 14
Degree of development: There are 2 lots, with a total area of 2 ha. built
Distance from the center
of the municipality: 1,5 km
Ownership: 100% – state owned
Contact: Cvete Stanojoska – Local Economic Development in Municipality of Prilep
Telephone: +389 77 540 919
Email: [email protected] // [email protected]
Web page: www.prilep.gov.mk
Available infrastructure in the zone
Electricity | |
Water supply | |
Sewerage | |
Sewage | |
Telephone | |
Access to construction plots through asphalt or swabbed area of infrastructure |
Distance
Distance from: | Kilometers |
Highway E – 75 | 60 |
Highway Е – 90 (R. Greece) | 84 |
Port Thessaloniki (R. Greece) | 220 |
Port Durres (R. Albania) | 285 |
Airport Skopje | 115 |
Airport Ohrid | 85 |
Airport Thessaloniki (R. Greece) | 200 |
Border with Turkey | 633 |
Bitola | 44 |
Resen | 80 |
Ohrid | 126 |
Usage of the free locations
for construction: Buildings for light and non-polluting industry
Lease /sale: Sale
Initial price for the land: The initial price for a building lot is 61,00 den per square meter, with 10,00 denars bidding step in case the usage is for housing and 100,00 denars bidding step for building lots with usage for warehouse and small economy.
Characteristics of the free building lots
Number of building lot | Area (m2) | Construction area (m2) | Maximum construction height (meters) | Initial price for the land
(den/m2) |
Fee for arranging construction land – price (den/m2) | Purpose |
2 | 1.599,00 | 683,00 | 10,00 | 61,00 | 300,00 | G3 |
5 | 1.111,00 | 564,00 | 10,00 | 61,00 | 300,00 | G3 |
6 | 897,00 | 460,00 | 10,00 | 61,00 | 300,00 | G3 |
7 | 710,00 | 310,00 | 10,00 | 61,00 | 300,00 | G3 |
8 | 1.071,00 | 542,00 | 10,00 | 61,00 | 300,00 | G4 |
9 | 1.135,00 | 543,00 | 10,00 | 61,00 | 300,00 | G4 |
10 | 1.458,00 | 756,00 | 10,00 | 61,00 | 300,00 | G4 |
11 | 1.396,00 | 770,00 | 10,00 | 61,00 | 300,00 | G4 |
12 | 1.050,00 | 597,00 | 10,00 | 61,00 | 300,00 | G4 |
13 | 1.040,00 | 478,00 | 10,00 | 61,00 | 300,00 | G4 |
14 | 1.040,00 | 524,00 | 10,00 | 61,00 | 300,00 | G4 |
15 | 990,00 | 486,00 | 10,00 | 61,00 | 300,00 | G3 |